Transportation In Nepal (Read More)

8:54:00 PM

Jestha 8th , 2073- JAJARKOT tallubagara Dolpa road transport through the cooperation of the Bheri river rope to safety. Tallubagara Jajarkot and Rukum chaharibagara Bheri river rope with the help of the chaos jeep, tractor and other vehicles is provided through.


Army JAJARKOT-Dolpa road construction task force and the initiative of the local UN Rukum Gotamkot Traders are constructed. Gotamkot Kamal Thapa, Yajna Khadka, light Khadka, darimana Basnet, jiema sacrifice to attain the 18 million inhabitants of 13 investment Traders are constructed.
Bheri river, railroad and made the shore end of the pillar at a time with the help of pulleys, hanging perch fried Thapa 1 car. Bheri river when the bridge built by the joint investment vehicle tuina he said Fried.


Traders and construction of special assistance to the Nepal Army, he said. 60 thousand and 80 thousand SUVs Jeep fried tuinabata take the Thapa said. "The survey is designed to Bheri bridge construction has not even talk," he said. Military action if the parties Jajarkot and Rukum the road construction is complete waiver of the Bheri River and other river bridge to traffic problems in the operation, said Thapa.
Bheri bridge will be unsure and local avajavata conveys the torment for some time, he said the construction of temporary Traders. Mules and horses through the local river to a 40-year-old is the only bridge linking chronic.

Up to 16 kilometers from the manakabagara chaharabigara-constructed road transport vehicles immediately resumed by Dolpa, Jajarkot and torture to lack of residents' intention to remove the car tuinako built, he said.
3 of 3 Jeep and tractor tuinabata Jajarkot tallubagarama is tarieko. Prior to this, the Bheri river Batha radijiula beach and Jajarkot manamai tuinako the temporary building was tarieko transport. The tuinabata means tallubagarasamma traffic from crossing operation was manamai.

You Might Also Like

0 comments

Popular Posts

Like us on Facebook

Flickr Images